Broad
Overview of Costing for
Beach Project – 2007 - 2010
A broad overview of the
estimated costing of the SFB
Beach Project is shown
below. The three major
components of the
Construction Phase are the
dredger, the sand pipeline
and the three reefs.
|
MS 5012 Dredger – March,
2007
The IMS 5012 HP dredger has
been selected for the
Estuary Dredging. This
self propelled dredger is
manufactured in the US and
is considered best for this
type of operation as it is
used in many similar type
operations around the world.
|
|
|
Cost of Dredge
including GPS
System |
R 3.50 m
** |
|
Sand Pipeline and Booster
Pump System – March, 2007
Fixed sand pipeline from
Pump House at Shore Road
through to the Main Beach
parking at Nevil Road. This
also includes a stand-by
emergency pump system in
case of electrical outages
as well as a booster system.
|
|
|
Cost of Sand
Pumping System
including Pumps |
R 3.00 m |
|
Submerged Reefs 2007 - 2009
Cost of three
reefs with Reef 1 located
off Ann Avenue, Reef 2 off
Geaorge Road and Reef 3 in
the vicinity of Aldabara Run
|
|
|
Reef 1 |
R 4.50 m |
|
Reef 2 |
R 4.50 m |
|
Reef 3 |
R 4.50 m |
|
Sub Total |
R
13.5 m** |
|
Project
Total |
R
20 m |
Contingencies –
2008 / 2010
Possibility of
an additional
reef plus dune
reshaping |
R
5.00 m |
|
Grand Total |
R 25.00 m** |
Note:
Detailed
estimates including the
possibility of an additional
reef will be available in
December, 2006 once the
Design Phase has been
completed by ASR.
For further
information go to the
specific areas on the Beach
Trust website.
**
Subject to fluctuations in
the R / $ exchange rate.
St Francis Bay
7 October,
2006 |